Why Tamarisk Road needs rebuilding
Tamarisk Road was built as a two-lane county road in the 1960s. The east side of the city has grown around it, and the road has not kept up.
The short version
- There were 187 crashes on this stretch from 2020 to 2024. Two people died.
- Most of the road has no sidewalk, no bike lane and little lighting.
- The crossing at the Mill Street wash floods and closes the road.
Crashes
Police reports show 187 crashes on Tamarisk Road between Depot Street and Fairground Drive from 2020 through 2024. Eleven caused serious injuries and two were fatal. Fourteen involved a person walking or riding a bike.
Nearly two out of three were rear-end or left-turn crashes: a driver stops in the travel lane to turn, and the driver behind does not stop in time. A center turn lane takes turning cars out of the flow.
Walking and biking
Only 38 percent of the road has a sidewalk, and the pieces do not connect. People walk on the dirt shoulder to reach bus stops, the school and the community center. There is one marked crosswalk in 2.4 miles.
The project adds continuous sidewalks, bike lanes and three safer crossings. Curb ramps and signals will meet current accessibility standards.
Flooding
At the Mill Street wash the road dips to the level of the streambed. In the last five years the City has closed it nine times during storms, for as long as two days. Emergency vehicles then take a detour that adds about six minutes.
A bridge will carry the road over the wash, and a new storm drain will take water off the pavement along the whole route.
Traffic
About 18,400 vehicles use the road each weekday, up from 13,100 in 2010. The project does not add through lanes. It keeps one lane each way and adds a turn lane, which the traffic study found handles expected volumes through 2045.
The street, today and after
A typical block, looking east. Widths are in feet.
Today
After construction
What changes
| Today | After construction | |
|---|---|---|
| Travel lanes | One each way | One each way, plus a center turn lane |
| Sidewalks | On 38 percent of the road | Both sides, the full length |
| Bike lanes | None | Both sides, the full length |
| Signals and marked crossings | 1 | 4 |
| Streetlights | At intersections only | The full length |
| Mill Street wash | Low crossing that floods | Bridge |
| Bus stops with shelter | 0 | 2 |
Who pays for it
The project costs $38.6 million. No property assessments are charged to owners along the road.
- Federal road safety grant
- $21.4 million
- Calder Springs transportation sales tax
- $12.2 million
- County Flood Control District
- $5.0 million