A nine-foot vanity with the sink carved into it.

The architect drew a wall-hung vanity nine feet long, with a sloped basin cut into the stone itself and no visible support.

Bathroom with a long limestone vanity along one wall and a walk-in shower beyond.

Job facts

Location
Catalina Foothills
Client
Custom home builder, with the project architect
Material
Honed limestone, 3 cm, mitered to read as 6 inches
Scope
Primary bath vanity with carved trough sink, shower bench and curb; four guest vanities
Schedule
Shop drawings to install: 5 weeks

The problem

The drawing showed a block of stone six inches thick floating off the wall. A solid piece that size would weigh about 900 pounds, more than the wall could carry.

The basin had to drain through a slot at the back, with no metal visible from above.

Constraints

  • The wall was already framed. Any steel had to fit inside a 2-by-6 stud bay.
  • Limestone is soft. A sloped basin has to be thick enough at its lowest point not to crack, and that point is exactly where the drain goes.
  • The builder’s tile setter needed the top in before the wall tile, and was booked for one week only.
Sloped sink carved into a stone vanity top below a wall-mounted black faucet.
Honed limestone, 3 cm, mitered to read as 6 inches

What the crew did

  1. We built the top as a mitered box from 3 cm stone: it looks six inches thick and weighs 310 pounds.
  2. Our shop drew a steel frame with the builder’s engineer. The framer welded it into the stud bay before drywall and we templated off the steel.
  3. The basin was milled on the CNC router in four passes, then hand-honed. We left an inch and a quarter of stone at the drain and bonded a fiberglass mesh underneath.
  4. The top went in as one piece on a Monday. Four of us carried it, and the tile setter started Tuesday.

The result

The vanity hangs level to within a thirty-second of an inch over nine feet. Water clears the basin in under ten seconds.

The builder now sends us shop drawings at framing stage instead of after drywall.

All projectsNext project: An outdoor kitchen in full sun

Tell us about the job.